Shelly Water Valve Kit

 

Picture1.png

The Shelly Water Valve Kit is an all-in-one solution for monitoring and mitigating water leaks.

 

Picture9.png

Kit Components

 

 

 

 

Specifications

 

 

 

 

 

 

 

Wiring Guide

 

 

 

 

Step-by-Step Instructions

  • Mount the two Din Rails in the enclosure using the supplied hardware

  • Mount the Top Rail Components

    • A SS2 Spacer goes on the left end of the rail

    • Shelly ARUS-RW-60-24-D3 mounts next to the spacer on the left side

    • A Din Rail Spacer mounts next to the Shelly Power Supply

    • A DK2.5NC-PE ground terminal mounts towards the right-hand side of the rail

      • The top connector of this terminal will connect to the Ground Terminal of the Power Supply

      • The bottom connector of this terminal will connect to the ground output of the DK2.5NC-PE on the bottom rail

      • When the screws on the terminals are tightened the terminals will bite into the rails

  • Mount the following components to the bottom rail, in this order (from left to right)

    • SS2 Spacer

    • (1) DK4N Terminal

      • The top connector on this terminal gets connected to one of the (+V) terminals of the Shelly Power Supply

    • (1) DK4N-BK Terminal

      • The top connector on this terminal gets connected to one of the (-V) terminals of the Shelly Power Supply

    • SS2 Spacer

      • This will hold the output terminals and connections on the left-hand side of the din rail.

    • SS2 Spacer

      • Leaving roughly a 3-inch space between the previous SS2 Spacer this will be used to hold the remaining terminals in place

  • (2) DK4N-BK Terminals (connected by a two-position jumper)

    • The top terminal of each is connected to the (L) Line Voltage and (I) Input terminals respectively

    • The bottom terminal of one of these two terminals will be connected to the line voltage input

  • (2) DK4N Terminals (connected by a two-position jumper)

    • The top terminal of each is connected to the (N) Neutral terminals of the Shelly Plus 1PM and Shelly Power Supply

  • A DK2.5NC-PE ground terminal mounts towards the right-hand side of the rail

    • The top connector of this terminal will connect to the bottom connector of the DK2.5NC-PE terminal on the top rail

 

 

Tips & Tricks

  • Use wire appropriate to your application.

  • Ground terminals should be securely fastened to the rail.

  • All wiring going in and out of the enclosure must pass through a strain relief.

  • When routing wires in the enclosure, zip ties, and adhesive zip tie mounts are helpful.

  • Use spacers to hold devices in place and to separate components.

  • All screw terminals should be properly tightened. Overtightening will result in damaged components.

  • Use the washers included with the hardware to mount the din rails.

  • Using stranded wire of the appropriate size is generally preferable to using solid core.

Downloadable Guide

 

 

Â